Varied and diversified experience of working in different formations of WAPDA which including the following;
Member (Power) WAPDA (2013-2014)
Responsibilities
- Dealing with AH Authority matters
- Monitoring of all under execution hydro power projects
- Performance monitoring of all existing hydro power plants
- Processing and Perusal of PC-1 for rehabilitation of old hydro power plants at CDWP and ECNEC
- Arrangement of foreign financing for rehabilitation projects of hydro power plants such as Jabban 22MW, Warsak rehabilitation project, Mangla rehabilitation project through negotiation with USAID, AFD France
- Training activities for Capacity building
Member of BOD of Neelam Jhelum Hydro Power Construction Company
Fellow Member of Institution of Engineers Pakistan Life Member of Pakistan Engineering Council
Life member of Pakistan engineering congress
Former Member of Permanent Finance Committee of International Commission on
Irrigation & Drainage (ICID).
Represented Pakistan National Committee on Irrigation & Drainage in Moscow,
China, Malaysia & USA.
Attended Global Water Partnership meeting in Colombo, Sri Lanka.
Presented paper on ”Overview of Challenges and Strategies of Water Resources
Management in Pakistan” under UNESCO in Tehran, Iran.
Attended South Asia Regional Workshop on Transparency and Integrity in the Water
Sector, Dhaka, Bangladesh.
Attended International Expo: Zaragoza, Spain.
Attended 4!h Abu Dhabi Dialogue on Water Cooperation in South Asia, Abu Dhabi.
Visited China Institute of Water Resources and Hydro power Research to encourage
comprehensive collaboration in the area of Water Resources and Hydro power
Technology – China.
Visited Germany to have technical discussion between M/s. Lahmeyer International
Hydro power and Water Resources Division.
Visited India as a part of Pakistani delegation led by Pakistan Commissioner for
Indus Water.
Attended 1st Abu Dhabi Knowledge Forum being organized by International Centre
for Integrated Mountain Development (ICIMOD) and the World Bank Region –
Singapore.
Attended 105th meeting of Permanent Indus Commission – New Delhi, India
Attended 5th Asian Clean Energy Forum 2010 – Manjla, Philippines.
Visited Bangkok, Thailand to attend Implementation Supervision Mission for
WCAP.
Attended Workshop of the Abu Dhabi Dialogue Knowledge Forum – Kathmandu,
Nepal.
Attended 2nd Session of “Technical Workshop on Design of Tunnel Boring Machine
(TBM) at Singapore from 23.5.2011 to 27.5.2011.
Visit of Hydraulic Lab. And Cambridge office of M/s. Mott MacDonald at Wallingford
-UK from 11.6.2011 to 14.6.2011.
Visited Turkey regarding meeting with M/s. Limak, DSI & ENKA from 15.6.2011 to
17.6.2011.
Visited Kathmandu, Nepal to participate in the 17th Regional Council, 5th General
Assembly of GWP-SAS and Roundtable Dialogue on Hydro power Development
from 28,11.2011 to 01.12.2011.
Visited New Delhi, India to attend Secretary Level Talks on Wullar Barrage from
26.3.2012 to 28.3.2012.
Visited Kyoto, Japan to attend 80th Annual Meeting of ICOLD from 02.6.2012 to
09.6,2012
Visited France and Italy to discuss about Hydro power Projects in Pakistan from
28.6.2012 to 05.7.2012.
Jinnah barrage hydro power project
Neelum Jhelum hydro power project
Rani canal irrigation project
Thai canal irrigation project
Kachi canal irrigation project
Left Bank out fall drain.
Right Bank out fall drain.
Supervised feasibility / detail engineering design of following project:
Tarbela 4th extension Hydro Power 1410 mega watt
Kuram tangi Hydro Power 80 mega watt
Dasu hydro power project 4200 mega watt
Diamer bhasha Dam 4000 mega watt
Bunji hydro power Dam 7100 mega watt
Leave A Comment