Ex General Manager (Hydel) Operation Responsibilities: Management , Planning , O&M administration and financial control of WAPDA’s Nineteen (19) Hydel Power Plants of WAPDA, with a total installed capacity of 6902 MW.
From: June 2013 to August 2014
Employer: Pakistan Water and Power Development Authority,WAPDA.
Position Held: General Manager (Hydel) Development
Responsibilities:
Worked as General Manager (Hydel) – Development. I was responsible for monitoring of the under construction Hydel Development Projects, planning & implementation Rehabilitation of old Hydel Power Stations, Revision of Feasibility Reports / Pre-feasibility Reports, PC-I /PC II proformas, Technical specifications , Design and Tender documents of new Hydropower Projects.
May 2011 to May 2013
Pakistan Water and Power Development Authority,
Chief Engineer (Hyde!) – North WAPDA Warsak.
Worked as Chief Engineer (Hydel) – North WAPDA Warsak. I was responsible for O & M Administration and Financial control of 243 MM Warsak Power Station along with Dargai (20 MW) , Kurrum Garni (4 MW) and Chitral (1 MW) Hydel Power Stations. Also looked after Contract Administration for 22 MW Jabban Rehabilitation Hydro Electric Power Station.
January 2008 to May 2011
Pakistan Water and Power Development Authority,
Resident Engineer (Mechanical), Power Station Tarbela.
As Resident Engineer (Mechanical), I was engaged for the overall Management of Power Plant Static and Rotating equipment, Maintenance Engineering & Plants Services at Power Plant Tarbela (10X175 & 4X440 = 3510 MW).
My responsibilities were to ensure construction activities are undertaken in accordance with Project needs in general and compatible with project schedule and cost objectives in particular. Reviewing of all Method Statements dealing regarding major repair and modification works. Monitoring of maintenance activities on turbines and generators using Maintenance Management Program and scheduling through M.S Project software.
To monitor Contractor’s construction activities and provides advice as necessary to ensure they meet job specifications within budget and schedule and that they comply with operating units’ safety rules and procedures.
Contract administration, field purchasing, materials handling procedures, warehousing activities and to
Employer: WAPDA. Position Held:
Project. Responsibilities:
ensure proper expediting of and materials as necessary to meet project’s Installation & construction requirements. Managing Construction costs to achieve the approved budget Approval of Variation Orders (Site Instructions). To provide input to Q.C.P. project quality plans development and evaluates S.H.E. risks. Participation in the tender evaluation prior to award of the construction contract including a review and assessment of the contractors proposed build program.
To prepare business plan for maintenance and overhauling of Tarbela Units 1-10. Planning for major modification in Turbine and Generator components. including Turbine Inlet valves, shaft sealing system, Governing system, cooling water system, service water system, station drainage system and Turbine dewatering system etc.
Year 2001 to 2007
Pakistan Water and Power Development Authority,
Field Project Manager with M/s SNC – LAVALINE. the Canadian Consultants for Warsak Rehabilitation
To direct the procurement of permanent and non-permanent materials required for the proper completion of the work on schedule. Reviewing all engineering design drawings of the project before passing them for use to by project group and the contractor. To direct and supervise senior engineers in the performance of all aspects of their work. To exercise strict control over costs of construction particularly the use of labor, materials and equipment. This included reviewing variances from budget expenditure and recommending /initiating action to bring them under control.
Participated in the Subcontract bid analysis and award process and remained signatory to the final proposed Subcontractors selection documentation.
Participated in discussion of all contractual matters related to Sub-contractors employed on the project. Checking and authorizing all claims for payment from all Sub-contractors involved in his section of the project to * assure accuracy and meeting proper contractual obligations, thereafter passing them to the Commercial Manager/Control Manager for payment. Planning and establishment of the Construction Site temporary
Senior Engineer / Junior Engineer Operation and Maintenance at Tarbela
Hydel Power Station as; (1977-1989)
- Shift Engineer
- Electrical Maintenance Engineer of the Power Plants
- Inspection Testing and Record Engineer
- Electrical Maintenance Engineer of Intake and Outlet Gates of Power
PROFESSIONAL TRAINING AND MANAGEMENT COURSES
Training on Operation and Maintenance of hydropower plants
Middle Management and Senior Management Courses from WAPDA Administrative Staff College, Islamabad.
Technical refresher course at WAPDA, Faisalabad training academy
FORIENG INSPECTIONS AND TESTING
Pre-Shiprnent Inspection and Testing Of Generators and Power Transformers of Jabban Hydro Power Project at Jin-Lun, China
Inspection and Testing Of 132kv Power Cable Termination Kits at Zurich Switzerland Inspection and Testing Of 132kv Fire Retardant Cable at Belgium
Witnessing Of Model Testing and Design Of Coated Hydro Power Plant Runner at
Andritz Hydro Vevey Switzerland